Skip to main content

Chapter 6

Public Administration and Management

Lok Sewa Aayog (Public Service Commission) past exam questions

Past questions and answers

18 questions set from this chapter. Most repeated first.

  • 2082 · Service-Group Related Subject · 5 marks

"Delegation of authority is an administrative process of getting things done by giving responsibility to others." Justify this statement.

Answer

Delegation of authority is an administrative process of getting things done by giving responsibility to others. — Justification:

Delegation of authority means the transfer of authority by a superior to a subordinate to perform a specific task, along with the responsibility to complete it. It is called an administrative process because it moves through definite steps and is used as a regular tool of management to accomplish work through others. The statement is justified on the following grounds:

  1. Work through others: A manager alone cannot perform all tasks of an organisation. By delegating authority, work is distributed among subordinates, and results are obtained through their efforts. This is the essence of "getting things done by others."

  2. Transfer of authority with responsibility: In delegation, the superior grants authority to the subordinate and the subordinate accepts the responsibility to perform the assigned duty. Thus authority and responsibility go together, which makes execution of work possible.

  3. Definite process: Delegation is an administrative process because it follows a systematic sequence — (a) determination of results expected, (b) assignment of duties, (c) delegation of authority, and (d) creation of responsibility/accountability. This orderly procedure makes it administrative in nature.

  4. Division of work and specialisation: Delegation enables the division of work according to the ability and capacity of subordinates. It develops specialisation, increases efficiency and improves the quality of decisions.

  5. Effective control and accountability: Even after delegating authority, the superior remains accountable for the final result. The subordinate is answerable for the delegated work. Thus delegation maintains control while work is done by others.

  6. Development of subordinates and relief to the superior: Delegation gives subordinates an opportunity to take decisions, which develops their managerial skills and prepares them for higher responsibility. At the same time, it relieves the superior from routine work so that he can concentrate on important matters.

Conclusion: Thus delegation of authority is not merely the transfer of power; it is a systematic administrative process by which duties are assigned, authority is granted and responsibility is created so that organisational goals are achieved through the efforts of others. Hence the statement is fully justified.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What subject matters are included in report writing? Write down.

Answer

Subject matters included in report writing:

A report is a formal, factual and organized presentation of information. The subject matters (contents) generally included in report writing are:

  1. Title / Heading – the name and subject of the report.
  2. Introduction / Background – purpose, context and reason for preparing the report.
  3. Objectives – the aims the report intends to fulfil.
  4. Methodology / Procedure – the methods, sources and process used to collect and analyse information.
  5. Facts and Findings – the actual data, observations and facts collected.
  6. Analysis / Discussion – interpretation, comparison and examination of the findings.
  7. Problems / Issues – difficulties, gaps or shortcomings identified.
  8. Conclusion – the summary drawn from the findings.
  9. Recommendations / Suggestions – proposed solutions or corrective measures.
  10. References / Annexures – sources consulted and supporting documents, tables or appendices.
  11. Signature and Date – name, designation of the report writer and the date of submission.

In short, a report includes the title, introduction, objectives, methodology, findings, analysis, conclusion, recommendations and annexures.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

Mentioning the objectives of public relation management, what should be done to make the public relation management more effective? Describe.

Answer

Objectives of Public Relation Management

  1. To build and maintain a positive image of the organisation before the public.
  2. To create mutual understanding and trust between the organisation and its service users.
  3. To inform the public about the organisation's policies, programmes, services and achievements.
  4. To collect public feedback, suggestions and complaints, and to bring them into the decision-making process.
  5. To remove misunderstanding, rumour and distrust towards the organisation.
  6. To increase public participation, cooperation and support in the organisation's work.
  7. To make service delivery transparent, accountable and citizen-friendly.

Measures to Make Public Relation Management More Effective

  1. Clear policy and legal base: Frame a clear public relation policy, strategy and action plan, and manage it through a separate public relation unit or officer.
  2. Strong information system: Disseminate information regularly through press releases, websites, social media, publications, notice boards and public hearings.
  3. Use of information technology: Provide online services, e-information, grievance-handling portals and prompt replies to queries so that citizens need not visit offices repeatedly.
  4. Trained and skilled staff: Give regular training in communication, media handling, behavioural etiquette and public dealing to the staff involved in public relations.
  5. Prompt grievance handling: Establish an effective complaint and suggestion system with fixed time limits and inform the complainant about the action taken.
  6. Two-way communication: Not only give information but also listen to the public through surveys, meetings, suggestion boxes and feedback forms.
  7. Transparency and accountability: Publish service standards (citizen charter), costs, procedures and decisions openly to build public trust.
  8. Coordination with media: Maintain good and regular relations with print, electronic and online media and give timely, factual information.
  9. Behavioural improvement: Make the front-line service delivery polite, helpful and non-discriminatory so that the public feels respected.
  10. Periodic review and improvement: Evaluate public relation activities regularly, measure public satisfaction and improve the strategy accordingly.
  11. Adequate budget and resources: Allocate sufficient budget, manpower and materials to the public relation unit.
  12. Leadership commitment: Top-level management should support and guide public relation activities as a core management function, not as an extra task.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What is inventory account? Mention its importance in public property management.

Answer

Inventory Account

Inventory account is a subsidiary ledger/record maintained by a government office in which all movable and immovable public property (goods, materials, equipment, furniture, vehicles, buildings, etc.) held by the office are recorded in detail — showing description, quantity, unit, value, date of receipt, date of issue/disposal and balance. It is opened and maintained as per the rules of the Financial Comptroller General Office (FCGO) and the Public Procurement Act/Rules, and is verified through periodic physical counting.

Importance in Public Property Management

  1. Accurate record of property: It gives a complete and up-to-date account of all property received, issued, transferred or disposed of by the office.
  2. Protection against misuse and theft: Since every item is entered and its movement tracked, chances of misappropriation, loss or unauthorized use are reduced.
  3. Facilitates physical verification: It provides the basis for periodic physical counting and reconciliation of book balance with actual stock, as required by financial rules.
  4. Ensures accountability: It fixes responsibility on the concerned store-keeper/official for the property in their charge.
  5. Aids in budget and procurement planning: It shows existing stock, so unnecessary purchases are avoided and requirements are estimated correctly.
  6. Proper disposal of obsolete goods: It helps identify unserviceable or surplus items for timely disposal as per rules.
  7. Basis of financial statements: It supports correct valuation of inventory and preparation of annual financial reports/audit.
  8. Transparency and good governance: It promotes transparency, reduces corruption and strengthens internal control in public property management.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What is grievance management system in an office? Mention the process of the grievance management.

Answer

Grievance Management System in an Office

Grievance means any dissatisfaction, complaint or feeling of injustice arising in an employee's mind regarding his job, working conditions, treatment by superiors or terms of employment. A grievance management system is the formal, written and systematic mechanism established in an office to receive, examine and settle such complaints fairly, promptly and at the lowest possible level, so that employee morale, discipline and productivity are maintained.

Its main features are: a definite procedure with fixed time limits, a step-wise (hierarchical) appeal structure, written records of every complaint and decision, impartial handling, and the assurance that the complainant will not be victimised.

Process of Grievance Management

The process generally proceeds through the following steps:

  1. Receipt of grievance: The aggrieved employee submits the complaint in writing (or orally, which is then recorded) to his immediate supervisor, stating the facts, the cause of dissatisfaction and the remedy sought.
  2. Initial screening and acknowledgement: The supervisor or grievance officer acknowledges the complaint within a fixed period (usually 2–3 days) and checks whether it falls within the scope of the grievance procedure.
  3. Fact finding / investigation: Relevant facts are collected by examining records, hearing the employee and the concerned persons, and consulting the service rules and precedents.
  4. Decision at first level: The immediate supervisor or department head gives a written decision within the prescribed time limit (e.g., 7–15 days), either redressing the grievance or recording reasons for rejection.
  5. Appeal to higher level: If the employee is not satisfied, he may appeal in writing to the next higher authority (section chief, department head, then the chief of the office) within a fixed period.
  6. Grievance committee / final authority: In serious or unresolved cases, the matter goes to a grievance committee or the head of the office, whose decision is final within the office. In service matters, the employee may further approach the Public Service Commission, the Administrative Court or the concerned ministry as provided by the Civil Service Act and Rules.
  7. Implementation and follow-up: The approved remedy is implemented promptly, the employee is informed in writing, and the grievance officer keeps a follow-up record to ensure the same problem does not recur.
  8. Record keeping and review: All grievances, their causes and settlements are recorded in a grievance register and reviewed periodically to identify systemic weaknesses and improve office procedures.

In short, the grievance management system works on the principle of "settle the complaint as early as possible, at the lowest level, through a fair and written procedure."

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 10 marks

What are the differences between office inspection and monitoring? Describe about the roles of office inspection and monitoring in administrative work completion.

Answer

Differences between Office Inspection and Monitoring

BasisOffice InspectionMonitoring
MeaningOn-the-spot physical examination of office work, records, staff and facilities to verify whether rules and procedures are being followed.Continuous and regular observation of the progress of plans, programmes and activities against set targets and standards.
NaturePeriodic, sudden or scheduled; mainly fact-finding and fault-finding.Continuous, regular and systematic; mainly progress-watching.
PurposeTo check legality, regularity, discipline and compliance with rules.To measure performance, progress and achievement of objectives.
TimingConducted at a particular point of time, often without prior notice.Conducted throughout the implementation period at fixed intervals.
ScopeLimited to a specific office, section or unit.Wider — covers the whole programme, project or organisation.
MethodPhysical verification, record checking, questioning staff, observation of office environment.Reports, returns, meetings, field visits, progress reports, indicators.
AuthorityDone by a designated inspecting officer (e.g., section officer, department head).Done by the concerned manager, supervisor or monitoring committee.
OutcomeInspection report with directions, warnings or recommendations for correction.Monitoring report showing deviations and suggestions for improvement.
Nature of actionCorrective and disciplinary action may follow.Mainly advisory and supportive; leads to mid-course correction.
FrequencyPeriodic (monthly, quarterly, yearly) or as required.Continuous and periodic at regular intervals.

In short, inspection looks at how the work is being done (rules, discipline, records), while monitoring looks at how much work has been done (progress, target, result).


Roles of Office Inspection and Monitoring in Completion of Administrative Work

1. Ensuring regularity and discipline Inspection checks attendance, punctuality, maintenance of records (darta, chalani, personnel files) and obedience to the Civil Service Act and Rules. This keeps staff alert and disciplined, which is the base for timely completion of administrative work.

2. Verification of legal compliance Inspection verifies whether decisions, expenditures and procedures follow the Financial Procedures Act, Public Procurement Act and delegated authority. Illegal or irregular work is stopped before it grows, so work is completed through lawful means.

3. Measuring progress against targets Monitoring compares actual achievement with planned targets, time schedules and quality standards. It shows whether work is on time, ahead or lagging, which helps management decide the next step.

4. Identifying problems and bottlenecks Both inspection and monitoring bring out weaknesses such as shortage of staff, delay in decision-making, lack of resources or poor coordination. Once identified, these obstacles can be removed, and pending work moves forward.

5. Providing feedback and guidance Inspection reports and monitoring reports give feedback to the concerned office and staff. Directions for correction, suggestions for improvement and sharing of good practices help employees complete work correctly.

6. Controlling waste, misuse and corruption Regular inspection of store, cash, fuel and assets reduces misuse of public resources. Monitoring of expenditure and procurement reduces leakage, so the limited budget is used for completing planned work.

7. Maintaining quality of service delivery Monitoring of service delivery (citizen charter, service flow, time taken) ensures that service is given within the prescribed time and standard. Inspection verifies whether service seekers are actually satisfied.

8. Supporting planning and decision-making Data from inspection and monitoring help top management take correct decisions, revise plans and allocate resources where needed. This makes administrative work result-oriented.

9. Encouraging accountability and responsibility When staff know that their office will be inspected and their progress monitored, they feel responsible for results. This accountability increases work completion rate.

10. Evaluating performance and rewarding merit Inspection and monitoring findings are used in performance appraisal, promotion and transfer decisions. This encourages efficient employees and corrects inefficient ones, which ultimately helps in completing administrative work on time.

Conclusion Inspection and monitoring are complementary tools of good governance. Inspection ensures that work is done according to rules, and monitoring ensures that work is done according to plan and target. Together they bring regularity, transparency, accountability and efficiency in the completion of administrative work.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What is time management? What should an employee do to manage the time effectively?

Answer

Time management is the process of planning and consciously controlling the time spent on specific activities, so that work is completed efficiently, deadlines are met, and the best possible use is made of the limited time available. In simple terms, it means deciding in advance what to do, when to do it, and how much time to give it. It is an important skill for an employee because time is a scarce and non-renewable resource — once lost, it cannot be recovered.

Things an employee should do to manage time effectively:

  1. Set clear goals and priorities — Decide what is most important and urgent. Use the principle of "first things first" and tackle high-priority work before routine work.
  2. Prepare a daily/weekly plan — Make a to-do list or work schedule, allotting a specific time to each task. This gives direction to the day's work.
  3. Follow the time schedule strictly — Start work on time, avoid unnecessary delay, and complete each task within the allotted time.
  4. Avoid procrastination — Do not postpone work that can be done now. "Do it now" should be the guiding rule.
  5. Minimise distractions and interruptions — Reduce unnecessary phone calls, chatting, social media use, and uninvited visitors during working hours.
  6. Delegate and share work — Assign suitable work to subordinates and take help from colleagues so that the burden is divided and time is saved.
  7. Handle paperwork and meetings efficiently — Keep files and documents in order, keep meetings short and purpose-oriented, and avoid unnecessary correspondence.
  8. Take short breaks and rest — Short breaks refresh the mind and increase efficiency; fatigue reduces the speed and quality of work.
  9. Review and improve — At the end of the day, review how much work was completed and where time was wasted, and correct the plan for the next day.
  10. Use time-saving tools — Use computers, diaries, calendars, reminders and other tools to plan and track work.

By following these practices, an employee can complete more work in less time, reduce stress, meet deadlines, and contribute better to the organisation's goals.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What is management? Mention the functions of management.

Answer

Management is the process of planning, organising, leading (directing) and controlling the resources of an organisation — human, financial, physical and informational — in order to achieve stated objectives efficiently and effectively. In simple terms, it is the art and science of getting things done through other people.

Functions of Management

  1. Planning — Setting objectives and deciding in advance what to do, how to do it, when to do it and who is to do it; it provides the roadmap and reduces uncertainty.
  2. Organising — Identifying and grouping the work to be done, assigning duties, delegating authority and establishing relationships among people so that the plan can be carried out.
  3. Staffing — Filling and keeping filled the positions in the organisational structure through recruitment, selection, placement, training, appraisal and remuneration of human resources.
  4. Directing (Leading) — Guiding, motivating, supervising and communicating with employees to make them work willingly and enthusiastically towards organisational goals.
  5. Controlling — Measuring actual performance against the standards set in planning, finding deviations and taking corrective action so that objectives are achieved as intended.

These five functions are interrelated and form a continuous cycle — planning sets the goals, organising and staffing provide the means, directing activates the people, and controlling ensures that performance stays on track.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What is decision making? Discuss about the rational decision making process.

Answer

Decision making is the process of selecting the best course of action from among two or more available alternatives in order to achieve a desired objective. It involves identifying a problem or opportunity, gathering and analysing relevant information, evaluating alternatives, and choosing the one that gives the greatest benefit. In public administration, decision making is a core managerial function because every plan, policy, programme and daily administrative action depends on the quality of decisions taken by the concerned authority.

Rational decision making process

The rational model assumes that a decision maker is fully informed, has clear goals, can identify all alternatives, and chooses the alternative that maximises benefit. The process consists of the following steps:

  1. Identifying the problem — Recognising and clearly defining the gap between the actual situation and the desired situation. A wrongly defined problem leads to a wrong decision.
  2. Defining the objectives — Setting the specific goals or criteria (such as cost, time, quality, legality) that the decision must satisfy.
  3. Gathering and analysing information — Collecting relevant facts, data and opinions about the problem and its causes through study, consultation and records.
  4. Developing alternatives — Searching for and listing all feasible courses of action that could solve the problem. More alternatives give a better chance of finding the best solution.
  5. Evaluating alternatives — Comparing each alternative against the established criteria in terms of advantages, disadvantages, cost, risk and consequences.
  6. Selecting the best alternative — Choosing the alternative that best fulfils the objectives with the least cost and risk. This is the actual act of deciding.
  7. Implementing the decision — Communicating the decision to those concerned, allocating resources, and putting it into action through plans, instructions and supervision.
  8. Follow-up and evaluation — Reviewing the results, comparing them with the expected outcomes, and taking corrective measures if necessary. This feedback also helps improve future decisions.

Conclusion

The rational decision making process is a systematic, logical and step-by-step approach that increases the chances of choosing the most effective alternative. In practice, however, decision makers face limitations such as incomplete information, time pressure, limited resources and bounded rationality, so they often settle for a satisfactory rather than a perfectly optimal decision.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

Mentioning the concept of development administration, write down its characteristics.

Answer

विकास प्रशासनको अवधारणा र विशेषताहरू

(क) विकास प्रशासनको अवधारणा (२ अंक)

विकास प्रशासन भन्नाले राष्ट्रको आर्थिक, सामाजिक तथा संरचनात्मक रूपान्तरणका लागि सरकारी संयन्त्रले गर्ने योजनाबद्ध, उद्देश्यमूलक र परिणाममुखी प्रशासनिक क्रियाकलापलाई जनाउँछ। यो परम्परागत कानुन–व्यवस्था केन्द्रित प्रशासनभन्दा फरक भई विकासका लक्ष्यहरू (गरिबी निवारण, रोजगारी सिर्जना, पूर्वाधार निर्माण, जीवनस्तर उन्नयन) प्राप्त गर्ने साधनका रूपमा प्रयोग हुन्छ। यसको मूल उद्देश्य जनताको जीवनस्तर सुधार गर्दै दिगो विकास हासिल गर्नु हो। यसैले यसलाई "परिवर्तनको प्रशासन" (Administration of Change) पनि भनिन्छ।

(ख) विकास प्रशासनका विशेषताहरू (३ अंक)

१. परिवर्तनमूलक प्रकृति (Change-oriented): यसको मुख्य ध्येय सामाजिक, आर्थिक तथा राजनीतिक परिवर्तन ल्याउनु हो। यसले यथास्थिति होइन, सुधार र रूपान्तरणमा जोड दिन्छ।

२. उद्देश्यमूलक तथा योजनाबद्ध (Goal-oriented and Planned): यो निश्चित विकास लक्ष्य प्राप्तिका लागि योजना बनाई सञ्चालन गरिन्छ। यसले दीर्घकालीन योजना तथा तत्कालीन कार्यक्रमबीच तालमेल मिलाउँछ।

३. जनसहभागितामूलक (People's Participation): विकास प्रशासनमा जनता निष्क्रिय प्राप्तकर्ता मात्र नभई योजना निर्माण, कार्यान्वयन र मूल्याङ्कनमा सक्रिय सहभागी हुन्छन्। यसले "तल्लो तहबाट माथि" (Bottom-up) दृष्टिकोण अपनाउँछ।

४. लचिलो तथा अनुकूलनशील (Flexible and Adaptive): परिवर्तनशील परिस्थिति अनुसार यसले आफ्नो संरचना, विधि र कार्यशैली परिवर्तन गर्न सक्छ।

५. परिणाम तथा उपलब्धिमूलक (Result-oriented): यसले कार्यविधि भन्दा पनि उपलब्धि (Output/Outcome) लाई प्राथमिकता दिन्छ। यसको सफलता विकासका मापदण्डबाट नापिन्छ।

६. नवीनतामूलक (Innovative): यसले नयाँ विधि, प्रविधि र सोचको प्रयोग गरी समस्याको समाधान खोज्छ।

७. समन्वयात्मक (Coordinative): यसले विभिन्न निकाय, तह तथा क्षेत्रबीच समन्वय कायम गरी सामूहिक प्रयासलाई निर्देशित गर्छ।

८. जवाफदेही तथा पारदर्शी (Accountable and Transparent): यो जनताप्रति उत्तरदायी हुन्छ र कार्यसम्पादनमा पारदर्शिता कायम राख्छ।

९. ग्राहकमुखी (Client-oriented): यसले नागरिकलाई सेवाग्राहीका रूपमा स्वीकार गरी गुणस्तरीय सेवा प्रवाहमा जोड दिन्छ।

१०. सहभागितामूलक नेतृत्व (Participative Leadership): यसमा निर्णय प्रक्रियामा तल्लो तहका कर्मचारी तथा सरोकारवालाको सहभागिता रहन्छ।

निष्कर्ष: यसरी विकास प्रशासन परिवर्तन, जनसहभागिता र परिणाममा केन्द्रित भई राष्ट्रको समग्र विकासमा सहयोग पुर्याउने प्रशासनिक प्रणाली हो।

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

According to clause 41 of the Civil Service Act, 2049, under what circumstances is there a provision of removal or dismissal of a civil servant from service? Describe clearly.

Answer

Under the Civil Service Act, 2049 (read with its provisions on punishment and cessation of service), a civil servant can be removed or dismissed from service in the following circumstances.

(a) Serious misconduct or breach of discipline - a major departmental punishment (removal or dismissal) may be imposed after due inquiry when the civil servant commits serious misconduct, disobeys lawful orders or breaches the conduct rules.

(b) Conviction for a criminal offence involving moral turpitude - a civil servant convicted by a court of such an offence (for example corruption or fraud) can be removed from service.

(c) Corruption and illegal gratification - taking, giving or abetting a bribe or any illegal gain in connection with official duties.

(d) Appointment by false or forged documents - if the appointment was obtained through forged certificates or by hiding material facts, the person is liable to dismissal.

(e) Unauthorised absence or abandonment of duty - remaining absent without approved leave for a prolonged period, or failing to return from deputation or leave without valid reason.

(f) Misuse of authority or acts harmful to the service - misusing office or acting against the prestige, interest or discipline of the civil service.

(g) Failure to meet terms of service - violating the conditions of service fixed at appointment, or failing probation or being unfit for the post, where the Act allows termination.

Safeguards: Except where removal follows a court conviction, the civil servant must be given a reasonable opportunity to defend himself or herself before the punishment is imposed, and the order must come from the competent (appointing) authority. A person dismissed for misconduct is generally barred from future government service, and the order can be appealed to the Administrative Court or higher authority as provided in the Act.

Answer checked by Claude Sonnet · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 10 marks

What preventive and promotional activities are Commission for the Investigation of Abuse of Authority (CIAA) carrying on in control corruption? What additional steps should the commission need to take to make corruption control more effective? Write in brief.

Answer

Preventive and Promotional Activities of CIAA in Controlling Corruption

The Commission for the Investigation of Abuse of Authority (CIAA), constituted under Article 239 of the Constitution of Nepal as a constitutional anti-corruption body, carries on the following preventive and promotional activities:

Preventive Activities:

  1. Investigation and prosecution — inquiring into and investigating allegations of abuse of authority, corruption, and irregularity in public bodies, and filing cases in the Special Court.
  2. Surprise and regular monitoring — monitoring government offices, revenue offices, customs, land revenue offices, hospitals, and service delivery points to check irregularities.
  3. Asset investigation — investigating the source of property of public officials suspected of amassing wealth disproportionate to their known income.
  4. Preventive recommendations — advising concerned ministries and bodies to reform laws, procedures, and systems that create opportunities for corruption.
  5. Good governance promotion — conducting studies on corruption-prone sectors and recommending systemic reforms.

Promotional Activities:

  1. Public awareness — conducting awareness programmes, street dramas, radio/TV broadcasts, and distributing pamphlets to educate citizens about corruption and their right to complain.
  2. Complaint facilitation — operating complaint boxes, toll-free telephone lines, and online complaint systems so citizens can report corruption easily.
  3. Reward and encouragement — encouraging whistle-blowers and informants by keeping their identity confidential and rewarding good performers.
  4. Capacity building — training public officials and employees on ethics, integrity, and anti-corruption laws.
  5. Coordination — coordinating with the National Vigilance Centre, Office of the Attorney General, and other agencies in anti-corruption efforts.

Additional Steps Needed to Make Corruption Control More Effective

  1. Strengthen legal framework — amend the Prevention of Corruption Act to remove loopholes, ensure speedy trial, and provide stricter punishment.
  2. Ensure independence and autonomy — guarantee the CIAA's functional, financial, and administrative independence so that political pressure cannot influence its decisions.
  3. Increase institutional capacity — recruit adequate trained investigators, forensic experts, and IT specialists, and equip the commission with modern technology.
  4. Use of technology — expand e-governance in service delivery, digital payment systems, and online monitoring to reduce direct contact between officials and service seekers.
  5. Effective asset declaration system — make property declaration of public officials mandatory, verifiable, and publicly accessible.
  6. Strong whistle-blower protection — enact and enforce laws to protect informants from retaliation.
  7. Awareness and value education — include anti-corruption and civic ethics in school curricula and conduct continuous public campaigns.
  8. Coordination and accountability — strengthen coordination among anti-corruption agencies and make the CIAA itself accountable through periodic reporting to Parliament.
  9. Political commitment — ensure zero tolerance at the political level, as corruption cannot be controlled without honest political leadership.
  10. Fast-track prosecution — establish specialized benches and reduce case backlog so that offenders are punished promptly.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What kind of provisions have been made to prepare the Medium-Term Expenditure Framework (MTEF) in accordance with the Financial Procedures and Fiscal Responsibility Act, 2076 and its Regulation? Mention.

Answer

The Financial Procedures and Fiscal Responsibility Act, 2076 and its Regulation, 2077 make the Medium-Term Expenditure Framework (MTEF) a legally required, rolling planning tool. The main provisions are:

  1. Meaning - the MTEF is a rolling expenditure framework covering the coming fiscal year and at least the following two years, linking policy and plans with budget resources.
  2. Preparation by the Ministry of Finance - the Ministry of Finance prepares the MTEF with the National Planning Commission (NPC), based on the medium-term macro-economic framework and fiscal targets.
  3. Approval - the framework is placed before the NPC and the Government (Council of Ministers) for approval, ahead of annual budget preparation.
  4. Contents - it includes:
    • projected revenue, foreign aid and domestic borrowing;
    • total expenditure split into recurrent, capital and financial provisions;
    • the expenditure ceiling of each ministry or body for each year;
    • the deficit, its financing sources and public debt sustainability.
  5. Basis for the annual budget - the budget ceilings communicated to ministries and the annual budget must be consistent with the approved MTEF.
  6. Role of line ministries - ministries prepare their own medium-term estimates and projects within the ceilings, as prescribed by the Regulation.
  7. Annual review - the MTEF is reviewed and rolled forward every year for changes in economic conditions, resources and priorities.

Thus the MTEF binds budgeting to a medium-term resource envelope and supports fiscal discipline.

Answer checked by Claude Sonnet · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

Write in brief about the legal and institutional provisions related to prevention of Asset (money) laundering in Nepal.

Answer

Legal provisions

  1. Prevention of Money Laundering Act, 2064 (Asset/Money Laundering Prevention Act, as amended) - the main law. It defines money laundering and predicate offences, criminalises it, provides imprisonment, fines and confiscation of proceeds, and sets up the institutional structure.
  2. Rules and directives - the Money Laundering Prevention Rules and the Nepal Rastra Bank (NRB) AML/CFT directives set customer due diligence (KYC), record keeping and reporting duties.
  3. Supporting laws - the Mutual Legal Assistance Act, Extradition Act, Prevention of Corruption Act, and the Criminal Code (2074).
  4. International commitments - Nepal is a member of the Asia/Pacific Group on Money Laundering (APG), follows FATF Recommendations, and is a party to the UN conventions (Vienna 1988, Palermo 2000, Merida 2003).

Institutional provisions

  1. Department of Money Laundering Investigation - investigates money laundering offences and files cases in court.
  2. Financial Information Unit (FIU-Nepal) under NRB - receives, analyses and disseminates suspicious and threshold transaction reports.
  3. Nepal Rastra Bank - supervises banks and financial institutions for AML/CFT compliance and issues directives.
  4. National Coordination Committee - coordinates policy among the agencies concerned.
  5. Reporting entities - banks, financial institutions, insurers, cooperatives, casinos, remittance firms and dealers in precious metals must identify customers and report suspicious transactions.
  6. Nepal Police, Attorney General's Office and courts - handle investigation, prosecution and trial.

Conclusion: Nepal has a fairly complete legal and institutional framework, but enforcement, coordination and capacity remain the main challenges.

Answer checked by Claude Sonnet · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

What is public procurement? Mention the functions of Public Procurement Monitoring Office (PPMO).

Answer

What is Public Procurement?

Public procurement is the process by which a public body (government office, corporation or local body) acquires goods, works, consultancy services or other services from the private sector using public funds. It covers the whole cycle — planning and need assessment, budget allocation, preparation of bidding documents, invitation of bids, evaluation and award of contract, signing of the agreement, contract execution and monitoring, payment, and finally the completion and performance evaluation of the contract.

In Nepal, public procurement is mainly governed by the Public Procurement Act, 2063 (2007) and the Public Procurement Rules, 2064 (2008). Its basic principles are transparency, competition, economy, efficiency, fairness and accountability, so that public money is spent in an open and value-for-money manner.

Functions of the Public Procurement Monitoring Office (PPMO)

The PPMO was established under the Public Procurement Act, 2063 and works under the Office of the Prime Minister and Council of Ministers. Its major functions are:

  1. Policy advice and formulation: To give advice and suggestions to the Government of Nepal in formulating and improving public procurement policies, laws and procedures.
  2. Monitoring and evaluation: To monitor and evaluate whether public bodies are carrying out procurement according to the Act, Rules and standard bidding documents, and to direct them to correct irregularities.
  3. Preparation and approval of standard documents: To prepare, approve and revise standard bidding documents, standard request-for-proposal documents, standard forms of contract and standard evaluation formats.
  4. Maintenance of information system: To maintain and operate the electronic procurement information system (e-GP) and the national portal, and to publish procurement notices, contract awards and related information.
  5. Capacity building: To provide training, orientation and technical support to procurement staff of public bodies and to develop a pool of trained procurement professionals.
  6. Reporting to the government: To submit periodic reports to the Government of Nepal on the status, progress and problems of public procurement in the country.
  7. Investigation and recommendation: To investigate complaints and irregularities in procurement and recommend action against the responsible officials or firms as per the law.
  8. Coordination: To coordinate among public bodies, line ministries, the National Vigilance Centre and other agencies on procurement matters.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 5 marks

As per the current Right to Information Act, clause 27 about the procedures for obtaining information.

Answer

The procedure for obtaining information is set out in the Right to Information Act, 2064 (the procedure provisions appear in section 7 of the Act, with related duties of the information officer and the appeal provisions following). In brief:

  1. Application - any Nepali citizen wanting information of public importance applies in writing to the Information Officer of the concerned public body, stating the information sought. Only the prescribed cost of reproduction may be charged.
  2. Information Officer's duty - every public body appoints an information officer; he or she must help applicants, including those who cannot write, to submit the request.
  3. Time limits:
    • the information is given immediately if it can be, or within 15 days of the application;
    • if the information concerns a threat to a person's life or liberty, it must be given within 24 hours;
    • if consultation with a third party or another office is needed, extra time as allowed by the Act (up to 15 days more) may be taken, with written notice.
  4. Refusal - if the officer refuses, he or she must give written reasons and inform the applicant of the right to appeal.
  5. Appeal - the applicant may appeal to the head of the public body within the time fixed (7 days); the head must decide within the prescribed period (15 days).
  6. Complaint to the National Information Commission - a person who is not satisfied, or gets no reply, may complain to the Commission (within 35 days in the Act). The Commission can order disclosure and fine or recommend action against the responsible officer.
  7. Protection and penalty - an officer who wrongfully withholds information or gives false information is liable to a fine and departmental action.

Thus the Act makes access simple, time-bound and enforceable.

Answer checked by Claude Sonnet · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · Service-Group Related Subject · 10 marks

What is Disaster Management Cycle? Discuss about the main characteristics of the Disaster Risk Reduction and Management Act, 2074.

Answer

Disaster Management Cycle

The Disaster Management Cycle is a continuous and rotating process that shows the sequence of activities carried out before, during and after a disaster in order to reduce its impact and help the affected community recover. Since disasters are recurring events, the cycle has no fixed beginning or end — the recovery phase of one disaster becomes the preparedness phase for the next. It is generally divided into four phases:

  1. Mitigation (Pre-disaster): Long-term measures taken to reduce or eliminate the risk of a disaster, e.g. building earthquake-resistant houses, constructing embankments against floods, enforcing land-use and building codes, and insuring property.
  2. Preparedness (Pre-disaster): Readiness measures to respond effectively when a disaster strikes, e.g. early warning systems, stockpiling relief materials, preparing contingency plans, training search-and-rescue teams, and conducting mock drills and public awareness programmes.
  3. Response (During/Immediately after disaster): Immediate actions taken to save lives and reduce suffering, e.g. search and rescue, first aid and medical treatment, evacuation, providing food, shelter, clothing and drinking water, and restoring communication and lifelines.
  4. Recovery/Rehabilitation and Reconstruction (Post-disaster): Activities aimed at bringing life back to normal, e.g. restoring damaged infrastructure, reconstructing houses and schools, reviving livelihoods, and providing psychosocial counselling. This phase gradually merges into mitigation, completing the cycle.

In short, the cycle moves as Mitigation → Preparedness → Response → Recovery → Mitigation, and its purpose is to shift the emphasis from mere relief (post-disaster) to risk reduction (pre-disaster).


Main Characteristics of the Disaster Risk Reduction and Management Act, 2074

The Disaster Risk Reduction and Management Act, 2074 (2017) replaced the Natural Calamity (Relief) Act, 2039 and is Nepal's first comprehensive legal framework based on the concept of disaster risk reduction. Its main characteristics are:

  1. Shift from Relief to Risk Reduction: The Act changed the traditional relief-centred approach to a disaster risk reduction and management approach, giving priority to prevention, mitigation and preparedness rather than only rescue and relief.

  2. Three-tier Institutional Structure: It provides for Disaster Risk Reduction and Management bodies at all three levels of government —

    • National Council chaired by the Prime Minister (policy-making),
    • National Executive Committee chaired by the Minister for Home Affairs (implementation, coordination and direction),
    • Provincial and District/Local Level Committees for province, district and local levels, thus institutionalising disaster management from the centre to the grassroots.
  3. National Authority (NDRRMA): It provides for the establishment of the National Disaster Risk Reduction and Management Authority (NDRRMA) as the central executive body under the Ministry of Home Affairs to carry out disaster risk reduction, response, recovery and reconstruction works.

  4. Provision of a National Strategic Action Plan: The Act requires the preparation of a National Disaster Risk Reduction and Management Strategic Action Plan and periodic revision of policies, plans and programmes in line with it.

  5. Defined Roles and Responsibilities: It clearly assigns duties to the federal, provincial and local governments, ministries, security agencies (Nepal Army, Nepal Police, Armed Police Force), Red Cross, NGOs, the private sector and citizens, ensuring coordination and accountability.

  6. Provision of Disaster Funds: It provides for the creation of a Disaster Risk Reduction and Management Fund at the national level and similar funds at provincial and local levels for rescue, relief, recovery and reconstruction works.

  7. Classification of Disasters: Disasters are classified as small, medium and large-scale (based on the capacity of the level of government to handle them), and the level of government responsible for response is determined accordingly — local level for small, province for medium and federal for large-scale disasters.

  8. Relief and Rescue Standards: It makes provision for minimum relief standards, compensation to the families of persons killed or injured in disasters, and relief to affected persons in a transparent and dignified manner.

  9. Emphasis on Preparedness and Early Warning: It requires the preparation of early warning systems, emergency operation centres (EOCs), contingency plans, hazard maps and risk-sensitive land-use planning, and the conduct of search-and-rescue and awareness programmes.

  10. Mainstreaming and Institutionalisation: Disaster risk reduction is to be mainstreamed into development plans, policies and programmes of all sectors, and a Disaster Risk Reduction and Management Information System is to be maintained.

  11. Provision of Emergency Declaration: The Act empowers the President, on the recommendation of the Council of Ministers, to declare a state of disaster emergency in the whole or any part of the country in case of a severe disaster.

  12. Punishment and Legal Remedy: It provides for punishment (fine and imprisonment) for offences such as obstructing relief work, misusing relief materials or giving false information, thereby making the law enforceable.

Thus, the Act, 2074 is a landmark law that institutionalises disaster management in a coordinated, decentralised, rights-based and risk-reduction-oriented manner in Nepal.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

  • 2082 · 2nd Paper: Contemporary Studies and Public Service Management · 5 marks

Describe the components of human resource management.

Answer

Components of Human Resource Management

Human Resource Management (HRM) is the process of managing people in an organisation so that organisational goals and individual goals are both achieved. Its main components are:

  1. Human Resource Planning — Forecasting the number and type of employees the organisation will need in future, and planning recruitment, transfer, promotion and retirement accordingly. It matches manpower demand with supply.

  2. Recruitment and Selection — Recruitment means attracting suitable candidates to apply for vacant posts (internal and external sources). Selection means choosing the most suitable candidate through tests, interviews and reference checks, and giving the appointment letter.

  3. Placement and Induction (Orientation) — Putting the selected employee in the right job according to his/her qualification and ability, and introducing him/her to the organisation, its rules, colleagues and working environment.

  4. Training and Development — Training improves the skill and knowledge needed for the present job; development prepares the employee for future higher responsibilities. Methods include on-the-job (apprenticeship, coaching) and off-the-job (lecture, seminar, case study) methods.

  5. Performance Appraisal — Systematic evaluation of an employee's work performance against set standards, to decide promotion, transfer, reward, training need and demotion. It also gives feedback to the employee.

  6. Compensation and Benefits — Determining fair wages, salary, allowances, bonus, provident fund, gratuity, insurance and other facilities so that employees are motivated and retained.

  7. Employee Welfare, Safety and Health — Providing canteen, rest room, medical facility, safe working conditions and social security, which raise morale and reduce labour problems.

  8. Motivation, Discipline and Grievance Handling — Using financial and non-financial incentives to motivate employees, maintaining discipline through rules and codes of conduct, and settling their complaints through a proper grievance procedure.

  9. Industrial (Employee) Relations — Maintaining good relations with trade unions, collective bargaining, and handling disputes so that industrial peace prevails.

  10. Promotion, Transfer, Demotion and Separation — Managing the movement of employees upward (promotion), sideways (transfer), downward (demotion) and finally out of the organisation (retirement, resignation, retrenchment, dismissal).

Conclusion: All these components are interrelated and together form the HRM system. Their proper management ensures the right person in the right job at the right time, which increases efficiency, job satisfaction and organisational effectiveness.

Answer checked by Claude Haiku · Oct 21, 2026

Test yourself · 2 MCQs

Loading…

Questions from Lok Sewa Nayab Subba NASU General (Nayab Subba (Non-Gazetted First Class) or equivalent · Service-Group Related Subject · 2082), Lok Sewa Nayab Subba NASU Various (Nayab Subba (Non-Gazetted First Class) or equivalent · 2nd Paper: Contemporary Studies and Public Service Management · 2082), Lok Sewa Nayab Subba NASU Audit Service (Nayab Subba (Non-Gazetted First Class) or equivalent · 3rd Paper · 2082), Lok Sewa Nayab Subba NASU Non-Technical (Nayab Subba (Non-Gazetted First Class) or equivalent · 2nd Paper · 2082), Nepal Judicial Service Nayab Subba (Nayab Subba (Non-Gazetted First Class) or equivalent · 3rd · 2082), Nepal Administration and Federal (Nayab Subba (Non-Gazetted First Class) or equivalent (Non-Technical) · 3rd · 2082), Nepal Foreign Service Nayab Subba (Nayab Subba (Non-Gazetted First Class) or equivalent · 3rd · 2081), Nepal Administration Service Nayab Subba (Nayab Subba (Non-Gazetted First Class) or equivalent (Non-Technical) · 3rd · 2081), Nayab Subba Non-Technical (Nayab Subba (Non-Gazetted First Class) or equivalent (Non-Technical) · 3rd · 2081), Nepal Judicial Service Nayab Subba (Nayab Subba (Non-Gazetted First Class) or equivalent · 3rd · 2081), Loksewa PSC Exam Question for Nayab Subba (Nayab Subba (Non-Gazetted First Class) or equivalent (Non-Technical) · 2nd · 2081), Nayab Subba Lok Sewa Exam Questions (Nayab Subba (Non-Gazetted First Class) or equivalent · Service-Group Related Subject · 2080), Nayab Subba Non-Gazetted First Class (Nayab Subba (Non-Gazetted First Class) · 2nd paper · 2079), Nayab Subba Exam Questions Lok Sewa (Nayab Subba (Non-Gazetted First Class) or equivalent · 3rd · 2080), Nayab Subba Exam Questions Lok Sewa (Nayab Subba (Non-Gazetted First Class) · Service-Group Related Subject · 2077), NHRC Nepal Assistant 1st Nayab Subba (Assistant 1st Level, Nayab Subba or equivalent · 2nd · 2081) and Lok Sewa Assistant Nayab Subba Pre (Assistant 1st Class / Nayab Subba or Equivalent, 5th Level · Pre-Qualifying Exam (Pretest) · 2083). Answers are written for this site; check them against your class notes.